|
advertisement |
|
|
|
|
|
|
Industrial Automatic Control Systems and Controllers Annotation << Back
Network Planning at an Engineering Company |
Yu.I. Dolgova
The article describes a small domestic database «YUNA-ASUP», which is implemented network planning method of manufacture of
products for the manufacture of machinery.
Built design and technological network as an information basis for production planning. The calculation of the total amount of all items
in the product ahead of their calculation, the calculation of the critical path, the search for closed contours, and other useful calculations.
As a result of the necessary network calculations get ready to work schedule throughout the manufacturing cycle of the product.
In addition to the work plan prepared in the same plan and the need for materials and equipment for the planning period.
However, there is a signifi cant difference from the usual settlement plan schedules. The plan is completely determined by the information
that was presented in the original knowledge base. Briefl y situation can be called like this: planners «rest». Here, the network simply
collected into a common chain of all the process steps that are in each area are considered necessary and correct. The whole cycle of the
product is assembled into a single network under the technology adopted in the enterprise.
Keywords: database; network planning; critical path; the plan works and materials.
Contacts: E-mail: juna@telecomdubna.ru
Pp. 38-47. |
|
|
|
Last news:
Выставки по автоматизации и электронике «ПТА-Урал 2018» и «Электроника-Урал 2018» состоятся в Екатеринбурге Открыта электронная регистрация на выставку Дефектоскопия / NDT St. Petersburg Открыта регистрация на 9-ю Международную научно-практическую конференцию «Строительство и ремонт скважин — 2018» ExpoElectronica и ElectronTechExpo 2018: рост площади экспозиции на 19% и новые формы контент-программы Тематика и состав экспозиции РЭП на выставке "ChipEXPO - 2018" |